A relay node that extends the power grid from an exterior generator (Solar Panel, Hydroelectric Turbine, Thermal Plant) back to the base. Each Transmitter bridges a segment of distance; chain multiple together to cover long runs. The final Transmitter in any chain must physically attach to the base's exterior wall to complete the circuit. Recipe: 1× Titanium + 1× Copper.
Stats
| Category | Utility |
|---|---|
| Build Tool | Habitat Builder |
Notes
Function: Relays power from exterior generators to base. Chain as needed. Final link must attach to base exterior.
Tips:
- Place Transmitters every 10–15m along the path from generator to base for reliable connectivity.
- Cheap recipe (1× Titanium + 1× Copper) — stockpile plenty before laying a long power cable.
- If base power suddenly drops to zero with generators running, check for a broken Transmitter link.